在安裝化工離心泵的時候,需要分六部完成具體的操作,操作得當可以讓護工離心泵在使用時產(chǎn)生非常好的工作狀態(tài),如果安裝不好可能減少泵的壽命,或者無法正常使用。 安裝前,收到廠家發(fā)送的化工離心泵后要先檢查,有沒有損壞,或者泵內(nèi)有無進入污垢等,如果有要及時清理,拆卸,如果完好無損無污,則可以直接安裝。在安裝化工離心泵時先做好泵的基礎(chǔ)平面,然后凝固后將泵安裝到平面上,看是否水平,然后灌漿孔澆灌水泥固定。在固定好后再次檢查水平,是否有傾斜。檢測聯(lián)軸器的外圓和兩聯(lián)軸器端面間隙誤差不能超過0.1毫米。檢查吸入管路和壓出管理的支架是否搭建好。離心泵的安裝位置是否吸入管道上安裝控制閥門和過濾裝置,防止污物進入泵內(nèi)(圖\文brfr.com.cn/)。 中譯英: In the installation of chemical centrifugal pump when, need six completion of specific operations, operating properly can let workers centrifugal pump in use have a very good working state, if the installation is not good may reduce the pump life, or cannot be used normally. Before installation, received the factory sends the chemical centrifugal pump after the first examination, there is no damage, or in the pump without entering the dirt, if there is time to clean up, remove, if intact and no pollution, can be installed directly. In the installation of chemical centrifugal pump well pump when the first foundation plane, then after the solidification of the pump is mounted to the plane, see whether level, then watering hole grouting cement fixation. The fixed again after inspection level, whether the tilt. Measurement of coupling and the outer circle of two coupling end clearance error can not be more than 0.1mm. Check the suction pipe and the pressure of management support is built. Centrifugal pump installation position whether inhaled installed on the pipeline control valve and filter, preventing dirt from entering the pump.
|